Back to rankings

Model comparison

Selected 2 / 5

See the differences. Choose what matters to you.

Differences vs. glm-5.3-flash · max

Compare settings
Quick select
Score, cost & time differences

Current baseline · glm-5.3-flash · max

54Backend engineering

Compared with glm-5.3-flash · max

  • k2.8 · high

    Backend engineering: tiedReference cost $0.21 ($0.19 more)Evaluation time 22m 14s (2m 0s less)

Differences reflect these evaluation tasks. Cost and time cover the same dimension, not a typical conversation. Scoring & cost notes

Tested configuration
Effort
Effort
Metricglm-5.3-flash · maxk2.8 · high
Backend engineeringglm-5.3-flashmax
54
k2.8high
54Tied
Overallglm-5.3-flashmax
56.80
k2.8high
63.55+6.75 pts
Frontend interactionglm-5.3-flashmax
75
k2.8high
72−3 pts
Knowledge & Reasoningglm-5.3-flashmax
40
k2.8high
70+30 pts
Visual aestheticsglm-5.3-flashmax
78
k2.8high
57−21 pts
Maintainabilityglm-5.3-flashmax
53
k2.8high
53Tied

Next, validate with your own work

Try a familiar task with each candidate. Compare the results, revision effort, and actual consumption.

Explore subscriptions for these modelsUsing an API? Refer to the evaluation consumption above. For subscriptions, explore matching plans and estimated runtime.